A new detached ADU usually costs more in total than an attached or in-house unit, because it needs its own foundation, roof, complete exterior shell and longer utility runs. Yet an attached ADU is not automatically cheaper: fire separation, structural changes, egress, low ceilings, moisture and hidden conditions in an older house can narrow the gap or reverse it.
Our earlier article on the construction differences between attached ADUs and DADUs explains how the two project types are built. This one looks only at cost: which line items each path adds, where each hides its risk, and when one comes out ahead. As with every United Signature project, no figures appear here, because the price of either type is set after a site visit and design.

“Attached ADU” Covers Three Very Different Projects
Before comparing costs, it helps to separate the projects that share the attached label. Each has its own cost structure.
Lower Levels and Attics Already Inside the House
The unit reuses an existing floor, roof and walls. Cost concentrates in what the space lacks: headroom, light, egress, insulation, waterproofing, plumbing routes and separation from the rest of the house.
Garage Space Attached to the Home
The shell is there, but a garage was never built to be lived in. A new insulated floor or slab, filled-in door openings, windows, heating and plumbing runs from the main house are typical additions.
Building a New Addition Onto the House
A new wing with its own foundation and roof that shares one wall with the main house. In cost terms it behaves much like a small detached cottage, plus the work of tying into the existing structure, roof and siding.
Lumping these together is why online comparisons disagree. A dry, tall basement next to the main plumbing stack and a garage that needs a new slab and new utility service are not the same budget.
Line Items a Freestanding Cottage Brings
A DADU builds everything from zero. It needs a foundation sized for its whole footprint, a complete roof, four exterior walls with sheathing, weather barrier, siding, windows and doors, and insulation on every surface. None of that can be borrowed from the main house.
It also adds distance. Sewer, water and power travel across the yard in trenches, and the sewer has to slope by gravity or be pumped. If the unit gets its own electric meter, the service work grows further; our guide to metering an ADU separately explains which utilities can be split.
Then comes site work: equipment access, excavation, hauling soil away and restoring the yard afterward. On a level alley lot those costs are modest; on a narrow lot with no rear access, they can become one of the larger items in the proposal.
Line Items Unique to Attached and In-House Units
Attached units save on shell and site, then spend on conditions inside the house.
Fire separation between dwellings comes first. The walls and ceiling between the units, the door between them and every pipe or duct that passes through need fire-resistant construction, and separate heating and ventilation for each unit are common.
Structure is next. New openings for an entry or windows need headers and sometimes beams, and a conversion can expose undersized framing that an engineer will want reinforced.
Egress is a frequent basement cost. A sleeping room needs an emergency escape opening, which below grade often means cutting the foundation wall and excavating a window well.
Ceiling height can be the most expensive surprise. When a basement is too low, the options are lowering the floor, which may require underpinning the house’s foundation, or accepting a different use for the space.
Moisture, old wiring, outdated plumbing and rot behind finishes often appear only once walls come open. Sound control between households adds insulation and resilient assemblies that a detached unit does not need.
Where Each Option Hides Its Risk
The two paths carry risk in different places, and that affects contingency as much as the base price.
A DADU’s uncertainty sits mostly underground: soil, groundwater, sewer depth and access. Much of it can be investigated before pricing through records, a site visit, sewer locating and, when needed, a soils report. Once those facts are known, a detached build tends to hold its estimate well.
An attached unit’s uncertainty sits behind drywall and under floors. Some of it can be checked with probes and inspection holes, but the full picture often arrives with demolition. That is why conversion proposals frequently carry broader allowances or clearly stated assumptions about existing conditions. Read those assumptions closely; they tell you how much of the price is fixed.
Comparing Total Cost With What You Get
A lower total does not always mean better value. A conversion reuses square feet, but it is limited by the space the house already has, and the area it takes was doing a job as storage, a workshop, a family room or parking. Replacing that function elsewhere has a cost of its own.
A detached cottage costs more, yet delivers separation that renters and family members value, a private entry and its own outdoor space, which usually support a stronger rent. Comparing the two by price per foot distorts the picture in both directions, for reasons explained in our article on why per-square-foot figures mislead ADU buyers.
Design Fees, Permits and Utility Charges on Each Path
Both project types need design, engineering and a building permit. A conversion adds measured drawings of existing conditions and often a structural review of the house. A DADU adds a full site plan and, on some lots, a survey or a geotechnical report.
Public charges apply to both. Utility connection and permit charges depend on the city and the provider rather than on whether the unit is attached, and King County’s sewer capacity charge applies to attached and detached ADUs alike where its regional system serves the property. Our overview of the factors behind an ADU’s price in Seattle covers these charges along with the rest of the budget.
Living Through the Work Changes the Cost Equation
A backyard build happens outside the main house. Daily routines shift around trucks and noise, but the household rarely has to move out.
An attached project happens inside or against the home. Dust protection, temporary shutoffs and work around an occupied space take time, and some families move out for part of the job. Those costs rarely appear in a construction proposal, yet they belong in the comparison.
When the Attached Route Usually Costs Less
A dry basement with adequate ceiling height, close to the main plumbing and with spare electrical capacity is the classic low-cost case.
An attached garage with a sound slab and a simple path for drain lines can also convert efficiently.
A tight budget, a small yard or a lot with difficult access to the backyard tilts the choice further toward converting space the house already has.
When a Backyard Cottage Is Worth the Higher Total
The house has no suitable space, or the basement would need lowering, waterproofing and structural work before it could be lived in.
Privacy matters to the household or the future tenant, and the unit is meant to be a long-term rental or a home for a relative.
The lot is level, has reasonable access and sits near a sewer line that allows a short gravity run.
To see how the package sizes line up for either path, browse United Signature’s ADU and DADU options. For a first look at what your parcel allows before anyone prices either route, request a free report on your property.
FAQ
Is a garage conversion counted as an attached ADU or a DADU?
It depends on the garage. Converting a garage attached to the house creates an attached ADU, while converting a freestanding garage creates a detached one. Cost-wise, both behave like conversions, because the shell already exists.
Can lowering a basement floor make a conversion cost more than a new cottage?
Yes. Excavating below the existing footings and underpinning the foundation is specialized structural work, and on some houses it pushes a basement conversion above the cost of building a detached unit.
Can a backyard cottage ever cost less than converting the basement?
It can, when the basement needs extensive moisture, structural and headroom work and the lot is level with easy access and a nearby sewer line. The comparison has to be made for the specific house and yard.
Which option is easier to price accurately before construction starts?
A detached unit usually is, because most of its unknowns can be investigated before the contract. Attached conversions depend more on conditions hidden inside the existing house.
Do attached and detached ADUs pay the same permit and utility charges?
Not necessarily the same amounts, since permit fees often scale with project size and value, but both types face permit fees and utility charges. Ask the city and the utility which charges apply to your specific project.